UNILEVER HOME AND PERSONAL CARE, USA GREENWICH, CT
The
scope of this project included repair and upgrade of the building Mechanical and Electrical Systems as well as interior demolition
and fitup for the 120,000 sq.ft. building originally constructed in 1970 as the Cheseborough-Ponds Headquarters. All work
was performed while the building was occupied.
Mechanical and Electrical work included: -Repair and upgrade of the
existing building air handling systems including the installation of new VFDs, coils, damper assemblies in the existing air
handlers. -Replacement of an existing absorption chiller with a new centrifugal chiller. -Installation of a new DDC
based building control system. -Interior Fitup for approximately 120,000 sq.ft. with new VAV, HVAC, Sprinkler, and Fire
Alarm throughout. -Design of Data Communications Systems for all 120,000 sq.ft.
|
|
PHYSICIANS HEALTH SERVICE SHELTON, CT
This
project involved the renovations and reconfiguration of the three buildings totaling over 300,000 sq.ft. originally constructed
as Headquarters and Research Facility for Richardson-Vick. The site included three buildings: Building ‘A’ - 60,000 sq.ft.
office building and Building ‘B’ - 130,000 sq.ft. Laboratory/Research building, both built in 1980, and Building ‘C’- 120,000
sq.ft. office building built in 1988.
The work consisted of Interior Renovation in Buildings ‘A’ and ‘C’ to accommodate
PHS’s requirements and a major Renovation to Building ‘B’ to convert it from a Laboratory Facility to office space.
|
|
GENERAL ELECTRIC STAMFORD, CT
This project
involved a complete Interior Demolition and Renovation of the site previously occupied by Walden Books. The existing facility
consisted of two interconnected buildings; the first, a 3-story, 60,000 sq.ft. building was built in 1976, and the second,
a 120,000 sq.ft. addition was built in 1988.
In addition to approximately 170,000 sq.ft. of Interior Renovation, specific
Engineering features of the project included: -Upgrade and Expansion of the existing 5,000 sq.ft. Computer Room. -Installation
of a 25 Station 2,500 sq.ft. Trading Floor. -Installation of a full Sprinkler System in the older building. -New addressable
Fire Alarm System throughout both buildings. -Replacement of existing chillers: -Upgrade of older building HVAC Systems
to chilled water. -Installation of redundant 500 KVA UPS Systems for Trading and Computer Room.
|
|